Motor Quality Assurance at MYSUN: What We Test, What Our Certifications Cover, and What You Can Request
How MYSUN conducts 100% production Hi-Pot testing and prototype dynamometer verification, what cETLus 5020003, UL 1004, CSA C22.2 No. 100 and ISO 9001 cover, and how to request test records.

When a motor fails in the field, the first question from the OEM's quality team is usually: what was tested at the factory, against which limits, and can we see the record? A supplier that answers with "every unit passes strict inspection" has not answered it. This page sets out what MYSUN POWER tests, what our certifications actually cover, and what you can request for your project, so your incoming inspection plan can build on it rather than duplicate it.
What every motor goes through
Every motor we ship is Hi-Pot tested; dynamometer testing is carried out on samples and prototypes. Our testing uses dynamometers and electrical performance analyzers for quality validation. Test reports and efficiency curves are provided for confirmed configurations.
| Test | What it verifies | Scope at MYSUN | What you can request | What to agree in your specification |
|---|---|---|---|---|
| Dynamometer test | Loaded performance: torque, speed, current and input power, from which efficiency is calculated | Samples and prototypes | Test report and efficiency curve for the confirmed configuration | Test points (voltage, load, speed) and acceptance limits for your duty |
| Hi-Pot (dielectric withstand) test | Insulation between windings and the motor frame withstands a high test voltage without breakdown | Every motor (100% factory tested) | Hi-Pot test record | Test voltage, duration and leakage-current limit required by your end-equipment standard |
| Environmental chamber testing | Behaviour under controlled temperature conditions | Scope agreed per project if required | Discuss during engineering review | Conditions and duration, if your validation plan needs them |
| Electrical performance analysis | Electrical input characteristics of the motor | Scope agreed per project if required | Discuss during engineering review | Parameters and limits relevant to your product |
We deliberately do not publish a single set of test voltages or limits here. The right values depend on the motor, the supply voltage and the standard your end equipment must meet, and they should be written into the project's quality agreement.
What our certifications cover
| Certification / standard | What it is | What it covers |
|---|---|---|
| Intertek cETLus Recognized, Control No. 5020003 | North American component recognition (Report 21010961HKG-001, issued by Intertek Testing Services HK Ltd) | Selected AC induction motor models: X9674-115.2, X9674-115.2-AL, X1441-115.2, X1441-115.2-AL |
| UL 1004-1 | Rotating electrical machines, general requirements | Standard the recognized models were tested to |
| UL 1004-3 | Thermally protected motors | Standard the recognized models were tested to |
| CSA C22.2 No. 100 | Motors and generators (Canada) | Standard the recognized models were tested to |
| ISO 9001 | Quality management system | Our manufacturing operations |
The Intertek document names Zhongshan Thunder Motor Co., Ltd. (中山市雷声电机有限公司). Zhongshan Thunder Motor Co., Ltd. and Guangdong MYSUN Power Technology Co., Ltd. are affiliated companies under common ownership and share manufacturing facilities, engineering teams, testing laboratories and the ISO 9001 quality management system. The recognition can be verified with Intertek by Control No. 5020003.
Two limits are worth stating clearly. The cETLus recognition applies to the listed AC induction models, not automatically to custom BLDC motors, geared motors or other configurations. And a component recognition is not a certification of your finished equipment. For a custom motor and for your end product, certification applicability is confirmed during project review. You can see the certificate image on our about page.
How to use our records in your incoming inspection
- Agree the test points first. Send the voltage, load and speed at which you want the dynamometer data, and the limits you will accept. A report at points that do not match your duty tells you little.
- Agree the Hi-Pot parameters. Your end-equipment standard usually defines them. Put them in the purchase specification.
- Decide what you still test yourself. With factory dynamometer and Hi-Pot records in hand, many OEMs reduce their own receiving tests to dimensional checks and a sample performance check. That decision is yours; we provide the records it needs.
- Plan certification early. If your end product needs North American approval, confirm during engineering review whether the motor configuration falls inside an existing recognition or needs evaluation. See cETLus Recognized vs UL Listed for HVAC projects.
The BLDC procurement TCO guide includes a list of incoming-inspection checks for magnets, bearings, insulation and machining.
About the factory
MYSUN POWER has motor-industry experience since 2010, an ISO 9001 certified quality management system, and an approximate annual manufacturing capacity of 600,000 motor units. We develop custom BLDC, AC (commercial HVAC AC motors) and high-torque geared motors. Prototype batches of 3–5 units are accepted for validation; production MOQ starts from 300 units.
Request factory test records for your project
Tell us the motor model or configuration and the test points you need. For certification questions, include your target markets and the standard your end equipment must meet.
Request factory test records →
Starting a new project that needs a certification applicability review? Submit RFQ for certification review.
Have a drawing with your inspection requirements marked? Use the separate drawing channel: Upload drawing for review.
Ready to Optimize Your Motor Performance & Lower TCO?
Guangdong MYSUN Power Technology Co., Ltd. delivers customized BLDC, AC, and high-torque geared motor solutions tailored to your thermal, mechanical, and efficiency specs. Engineering proposals in 14–30 days; prototype batches (3–5 units) and production timelines confirmed following engineering review.